Advertisement

Header Utility Menu

  • Subscribe
  • Advertise
  • Contact Us
  • Events

LinkedIn Facebook Twitter Instagram Get Our App

  • Login

Virginia Business

Mobile Menu

  • Issues
  • Industries
    • Banking/Finances
    • Business Law
    • Commercial Real Estate
    • Economic Development
    • Education
    • Energy/Green
    • Federal Contracting
    • Government
    • Healthcare
    • Hotels/Tourism
    • Insurance
    • Ports/Trade
    • Small Business
    • Technology
    • Transportation
  • Regions
    • Central Virginia
    • Eastern Virginia
    • Northern Virginia
    • Roanoke/New River Valley
    • Shenandoah Valley
    • Southern Virginia
    • Southwest Virginia
  • Reports
    • Best Places to Work
    • Business Person of the Year
    • CEO Pay
    • Coronavirus 2020
    • Generous Virginians Project
    • Legal Elite
    • Most Influential Virginians
    • Maritime Guide
    • Site Locator
    • The Big Book
    • Virginia CFO Awards
  • Company News
    • For the Record
    • People
  • Opinion
  • Lists
  • Awards/Events
    • Diversity Leadership Series
    • Vote Now for Women in Leadership
    • Virginia 500
    • Legal Elite
    • CFO Awards
    • Big Book of Lists
    • 100 People To Meet
    • Best Places To Work
  • Virginia 500
    • Read the issue
    • Order a copy
    • Buy an award plaque
    • Nominate execs for 2021

Advertisement

Header Primary Menu

  • virginiabusiness.com
  • Subscribe
  • Advertise
  • About Us
  • Contact Us

Home News Offshore wind components headed from Europe

Offshore wind components headed from Europe

Dominion Energy to begin construction on offshore wind turbines this spring

Published April 21, 2020 by Sydney Lake

Dominion Energy plans to develop the nation's largest wind farm — an $8 billion, 220-turbine project — off the coast of Virginia Beach by 2026. Photo courtesy Dominion Energy
Dominion Energy plans to develop the nation's largest wind farm — an $8 billion, 220-turbine project — off the coast of Virginia Beach by 2026. Photo courtesy Dominion Energy

Richmond-based Dominion Energy Inc. and Denmark-based Ørsted A/S announced Tuesday that major components of its $300 million Coastal Virginia Offshore Wind (CVOW) pilot project are being shipped to North America — which is on-schedule, despite the pandemic.

Major components for the two, massive 6-megawatt Siemens Gamesa offshore wind turbines from Denmark and Germany are en route via cargo ship to Halifax, Nova Scotia, Canada. The turbines will be 600 feet tall when measured from the ocean’s surface to the tip of the top blade — or taller than the Washington Monument — and will be able to power 3,000 homes at peak production, according to Dominion.

Construction is expected to begin later this spring and the turbines are scheduled to be in operation by the end of the year.

Dominion selected the Spanish renewable energy engineering company in January as the preferred turbine supplier for its offshore wind farm 27 miles off the coast of Virginia Beach. Construction for the pilot project began in June 2019, when Dominion broke ground on an onshore power substation for the turbines near Camp Pendleton.

“This is a monumental step toward the installation of the first offshore wind turbines in federal waters, which will deliver clean, renewable energy to our customers,” Mark D. Mitchell, Dominion vice president of generation construction, said in a statement. 

The pilot project is the first phase in Dominion’s plan, announced in September 2019, to build a $7.8 billion, 220-turbine wind farm off the Virginia Beach coastline by 2026. The wind farm, which would be the largest in the U.S., is part of Dominion’s goal of achieving net-zero carbon dioxide and methane emissions from its electricity generation and gas infrastructure operations by 2050. The entire project would produce enough zero-carbon electricity to power 650,000 Virginia homes.

Dominion this month is also conducting ocean surveys to map the seabed of the 112,800-acre lease area to determine impacts to ocean and sea life and develop the project’s Construction and Operations Plan to be submitted to the Bureau of Ocean Energy Management (BOEM).

Related Stories

offshore wind turbines in Europe

Dominion chooses turbine supplier for $7.8B offshore wind farm

Spanish engineering firm Siemens Gamesa will supply the 600-foot-tall turbines.

Dominion Energy has completed construction on two massive wind turbines 27 miles off the coast of Virginia Beach (Photo by Beth Cooper)

Dominion debuts first offshore wind farm in U.S. federal waters

Northam signs offshore wind legislation in Va. Beach ceremony

Virginia Business logo

Dominion files construction, operations plan for $7.8B offshore wind farm

Project off Va. Beach coast would eventually provide energy for 660K homes

Trending

Finance/Insurance: STEPHAN Q. CASSADAY

Finance/Insurance: PAUL B. MANNING

Federal Contractors/Technology: JASON PROVIDAKES

Education: ANNE M. KRESS

Artemis I to launch with help from Va. contractors

Sponsored Stories

Why is my Less Than Truckload (LTL) freight pricing going up and my service level going down?  

Beyond Juneteenth – How Capital One is Commemorating and Implementing Change

How We Help Your Business Operate Better

Before the Breach: Get Serious About Cyber Resilience

Professionals are Discovering What it Means to Live Uniquely in the Alleghany Highlands of Virginia

Riverside Logistics Celebrates 25th Anniversary!

Girls for a Change Empowers Black Youth for the Future Workforce

The Jackson Ward Collective is equipping Black-owned small businesses with the tools for success

Advertisement

Advertisement

Trending

Finance/Insurance: STEPHAN Q. CASSADAY

Finance/Insurance: PAUL B. MANNING

Federal Contractors/Technology: JASON PROVIDAKES

Education: ANNE M. KRESS

Artemis I to launch with help from Va. contractors

Sponsored Stories

Why is my Less Than Truckload (LTL) freight pricing going up and my service level going down?  

Beyond Juneteenth – How Capital One is Commemorating and Implementing Change

How We Help Your Business Operate Better

Before the Breach: Get Serious About Cyber Resilience

Professionals are Discovering What it Means to Live Uniquely in the Alleghany Highlands of Virginia

Riverside Logistics Celebrates 25th Anniversary!

Girls for a Change Empowers Black Youth for the Future Workforce

The Jackson Ward Collective is equipping Black-owned small businesses with the tools for success

Get Virginia Business directly on your tablet or in your mailbox!

Subscribe to Virginia Business

Advertisement

Advertisement

Footer Primary Menu

  • virginiabusiness.com
  • Subscribe
  • Advertise
  • About Us
  • Contact Us

Footer Secondary Menu

  • Industries
  • Regions
  • Reports
  • Company News
  • Events

Sign Up For Our Newsletter

Sign Up

LinkedIn Facebook Twitter Instagram Get Our App

Privacy Policy Cookie Policy

Footer Utility Menu

Copyright © 2023 Virginia Business. All rights reserved.

Site Maintained by TechArk